Hi folks - well I think this build is finally coming together at last.
A nice MASWA chap dropped in on the weekend and helped me move the old tanks into place (thanks Reece). The old Trigon is now a bypassable 350 lt water change tank. I can drain it and heat up the water before returning it into the system. I stuffed up the heights though

and had to drill out another hole in the return sump to make gravity work

lol I was that annoyed with myself i just drilled it vertical while it was there squirting a spray bottle at it every now n then - the glass cut out is still in the sump - thanks to Heliman for the glass cutters again (awesome lend thanks

) - lol, that's 6 holes now... I don't even bother using the template anymore.


And the old sump and frag rack.....has been promoted to a second level sump and frag rack


It's on the night shift - helps with ph from memory, plus it gives light into the sump room.

The old sump box is still coming in handy now as a giant tool box


Got some stick on insulation to help with temp control - it doubles as a black glass backing too

Chop